Slide Restructuring

Sometimes resurfacing isn't enough. Some times we have to restructure a slide.

Slides that rest on the ground take an especially hard beating from the weather. Moisture can permeate the underside, magnifying the freeze thaw cycles.

These slides were weakened and cracked so badly that a new fiberglass lining was required prior to a top coat resurfacing. In effect we put new slides inside the old.

There were three 325' and one 100' slides. Total working time: 3 weeks


Join Our Mailing List!
Receive emails about special offers, promotions, product information and news.
2008 ASTRATEK Resurfacing Corp. All rights reserved.     Chicago Web Design